We have finally finished building the deck. The deck was finished a week ago, but work has gotten in the way of blogging.
The deck looks fantastic and the main task left is to seal the deck.
I was really impressed with the final work. The steps edge out over the frame that supports them, and gives a really nice look.
The architectual rigging looks nice as well. The deck is only 500mm from the ground which means that the rigging doesn’t need to meet building standards. To meet building regulations we would need 8 rigging lines instead of just three.
Leave a Reply