Day 4 saw us make it through to the final straight with just a couple of things needed to be done. It doesn’t look like much progress has been made since Day 3, but the decking is all nailed down, the base boards (bits of decking on the sides) have been attached, and the stairs have been cut.
The final day will include: laying 1 board next to the house, attaching the handrail, finishing the stairs, adding the architectual rigging.
Leave a Reply