twitter

Jun
23

Deck Day 4

Posted By tupps/
0 Comment/

Day 4 saw us make it through to the final straight with just a couple of things needed to be done. It doesn’t look like much progress has been made since Day 3, but the decking is all nailed down, the base boards (bits of decking on the sides) have been attached, and the stairs have been cut.

The final day will include: laying 1 board next to the house, attaching the handrail, finishing the stairs, adding the architectual rigging.

Deck Day 4 WestDay 4 EastDay 4 North East

About the Author
I'm Luke Tupper and I am a software Developer residing in Melbourne Australia. Working with iOS, Android, MacOS and backend software (Python and Ruby). When not building software I can be found sailing, cycling or hiking. I also help run a sailing program for high school students and I am qualified National Judge and National Umpire in sailing.

Social Share

  • google-share

Leave a Reply Cancel reply

*
*